Required Info for quoting a Central Chiller
Advantage Engineering increases the profitability of industrial manufacturing companies in a wide range of industries by developing and manufacturing innovative industrial process cooling heat transfer equipment including water chillers, temperature control units and evaporative cooling towers.
We will need this information to complete a quote for your chiller. Below we’ve explained why we need each piece of information and why it is helpful.
**
Note: Below are the standard questions we ask when working on a central chiller project. In addition to this information, click here and please fill out this survey sheet
Material Type
- This information is not required, but can be helpful to help us understand your overall process; in the case you are running engineer grade materials and/or have a high temp process.
Material Throughput Rate (lbs/hr or pph)
- This helps us to understand the cooling cycles and the demand this will have on the temperature control unit. Also consider where the machine throat temperature is critical and the unit is required to keep up with the cycle.
Fluid Temp Required (F) from Central Chiller?
- This helps us understand which unit to provide as some have temperature limits.
Flow Rate (gpm)
- This will help us understand how to size the pump on the unit being quoted and if it can keep up based on the cycle time of the machine and the line sizes on the cooling channels of the mold.
Pressure Required (psi)
- Your cooling circuit may require a certain amount of pressure to satisfy flow on each cooling channel, cooling designs and modifications may change flow characteristics which require our unit to provide more pressure.
Number of Cooling Channels
- Knowing the number of cooling channels on your tool/mold will help us to understand the circuit and overall flow requirements for the unit based on the size of motor that will be specified.
Channel Diameter (inches)
- Knowing the channel diameter will help us to understand the flow characteristics on the overall circuit.
Number of Temperature Controllers (and hp’s)
- This helps us to understand the overall heat load (BTU’s) that the chiller will be responsible for cooling. If you need a central system, please see the survey sheet below.
Hot Runner Systems (and kW)
- This helps us to understand the overall heat load (BTU’s) that the chiller will be responsible for cooling. If you need a central system, please see the survey sheet below.
Return to the Support Center
If you are looking for some help with either getting equipment or setting it up, we have some articles that can help you.
Check out More Support ArticlesFeatured Articles
Support Process Cooling Smartflow
Tracer VM Flowmeter from Smartflow
The Tracer®VM Base Flowmeter is a non-display sensor that provides a 0.5 to 3.5 Volt [...]
Support Injection Molding TOYO
Top companies using TOYO Medical Injection Molding Machine
See why Top medical companies are using TOYO Medical Injection Molding Machine to make sure [...]
Support Injection Molding Slide
Slide Products Mold Metal Wipes
As a larger manufacturing company, if you are shutting down production for a temporary period [...]
Support Advantage Literature
Sentra Series Water Temperature Control Units
Sentra Temperature Control Units with their advanced design & technology continue to prove why they [...]
Support Material Handling Rapid Recycling
Opening and cleaning of the Rapid RAPTOR DUO Shredder
Opening and cleaning of the Rapid RAPTOR DUO shredder. Rapid Raptor DUO, the combination of [...]
Support RJG Training
Master Molder I – Make more parts and Money
2 weeks, 10 days, 64 hours of class, 17 hours of study, and 10 hours [...]
Support FCS Injection Molding
Required Info for quoting a Hybrid Injection Molding Machine
The goal is to make sure that your mold will fit, the screw will work [...]
Support Automation Yushin
Required Info for quoting an End of Arm Tooling
The goal is to make sure the robot fits your molding machine, then to make [...]